The first of the two spec buildings will consist of 65,000-sf and will feature tilt-up concrete construction, glass storefronts, and 20-ft ceilings. The estimated hard construction cost is $4 million.
The second building, a 100,000-sf distribution facility with 24-ft ceilings, carries an estimated construction cost of $6.5 million.
© 2025 ALM Global, LLC, All Rights Reserved. Request academic re-use from www.copyright.com. All other uses, submit a request to [email protected]. For more information visit Asset & Logo Licensing.