Houston, TX—Cameron, a leading provider of flow control equipment products, systems and services to worldwide oil, gas and process industries, has signed a long-term lease for 106,801 square feet at 8 West Centre, a 227,000 sq.-ft. new office development of CORE Real Estate, LLC located at 3505 West Sam Houston Parkway. This is the second largest deal announcement for the building since construction began and will now bring the development to its capacity. CBRE's Executive Vice President Cody Armbrister, Senior Vice President Kristen Rabel, and Senior Associate Rima Shpolyansky represented CORE Real Estate in the lease transaction. Senior Managing Director Brandi McDonald of Newmark Grubb Knight Frank represented Cameron.
“As this Lease demonstrates, the demand for office space in this area continues at an unrelenting pace,” said Mike Wyatt, Managing Director of CORE.
“As we engaged the market on the possibilities available at 8 West Center, we were very encouraged by the positive response to the building's strengths, quality and location,” said Armbrister. “Cameron International was able to identify this opportunity and quickly engaged our team to secure what is the last available large block of office space in the area. We are proud to have been a part of such a swift and successful lease-up of 8 West Center.”
Fronting the Sam Houston Tollway between Clay Road and Kempwood Drive in the center of west Houston, 8 West Centre is a four-story, concrete and glass constructed building featuring 59,000 sq.-ft. rectilinear floor plates. Design highlights include floor-to-ceiling glass around 60% of the perimeter, a distinctive and unique illuminated spire at the front entry of the building, natural stone materials in the lobby and common areas, a lush outdoor courtyard with seating area, and a full-service café offering tenants breakfast, lunch and catering services. The facility will also offer an impressive parking ratio of 4.6 spaces per thousand square feet of net rentable area in a 2.5-story structured parking garage and surrounding surface areas.
Construction on the project started August 2012 with core and shell completion targeted for June 2013. Cameron will occupy the new space in July 2013.
Want to continue reading?
Become a Free ALM Digital Reader.
Once you are an ALM Digital Member, you’ll receive:
- Breaking commercial real estate news and analysis, on-site and via our newsletters and custom alerts
- Educational webcasts, white papers, and ebooks from industry thought leaders
- Critical coverage of the property casualty insurance and financial advisory markets on our other ALM sites, PropertyCasualty360 and ThinkAdvisor
Already have an account? Sign In Now
*May exclude premium content© 2024 ALM Global, LLC, All Rights Reserved. Request academic re-use from www.copyright.com. All other uses, submit a request to [email protected]. For more information visit Asset & Logo Licensing.